09.06.15
With one week of rehearsal under their belts, the Dapto Chaser team have launched into week 2. We’ve been following this dog around the tracks so sneaked in to the rehearsal room to capture Week 1: the design presentation, first read, and the actors up and an it on the floor.
The rehearsal space |
Pouring over the designs |
The first read through |
The script! |
Up and at it on the floor |
Everybody needs tea (and coffee) |